Bando 11C195 Power King Combo, CM195 Syncro-Link STS HP Neoprene (Metric)

Vendor safid.com
Regular price $ 533.77
Tax included. Shipping calculated at checkout.
Description

Bando 11C195 Power King Combo, CM195 Syncro-Link STS HP Neoprene (Metric)Bando 11C195 To resolve problem applications where belts are flipping over or jumping out of the sheaves, utilize Bandos series of Combo belts. The tie band assures lateral rigidity and guides the belts into the sheave grooves. The tie band, reinforced with high strength transverse tensile cords, is fully oil and heat resistant and permanently welds the individual belts together. Combos utilize the premium quality Power King and Power Ace belts, with

lb Locked rotor torque 200 % Breakdown torque 260 % Locked rotor time 0s (cold) 0s (hot) Moment of inertia (J) 0

CEM2546T-G SPEC

lb Locked rotor torque 280 % Breakdown torque 280 % Locked rotor time 32s (cold) 18s (hot) Moment of inertia (J) 167 sq

D XP Division Division I Agency Approvals CSA EEV UL Ambient Temperature 40 °C Auxillary Box No Auxillary Box Auxillary Box Lead Termination None Base Indicator Rigid Bearing Grease Type Polyrex EM (-20F +300F) Blower None Constant Torque Speed Range 6 Current @ Voltage 52

Frame 254/6T Output 20 HP (15 kW) Number of Poles 2 Frequency 60 Hz Rated speed 3545 rpm Slip 1

186 LOCKED ROTOR TORQUE UOM OZFT INSULATION CLASS B LOCKED ROTOR AMPS 2

Catalog Number AEM3683-4 Enclosure TENV Frame 182 Frame Material Iron Frequency 60

5 NEMA NOMINAL EFFICIENCY 72 FULL LOAD AMPS PRIMARY 1

34-6483Z145 KW/HP

19 IN Service Factor 1

Amperes 361 A LRC 6

Standard NEMA MG-1 Frequency 60 Hz Voltage 208-230/460 V Number of poles 4 Degree of Protection IP55 Synchronous speed 1800 rpm Output rating 1 HP Mounting F-1 Flange Without Terminal box¹ Left position Enclosure IC410 - TEAO Electric Motors

Easy Shipping

Quick Dispatch:

Your Bando 11C195 Power King Combo, CM195 Syncro-Link STS HP Neoprene (Metric) orders ship within 1-2 business days.

Delivery Options:

  • Standard: 3-7 business days
  • Fast: 2-3 business days
  • Express: 1-2 business days

Order Tracking:

You'll receive a tracking link by email once your Bando 11C195 Power King Combo, CM195 Syncro-Link STS HP Neoprene (Metric) ships.

Need Help?
Questions about Bando 11C195 Power King Combo, CM195 Syncro-Link STS HP Neoprene (Metric), sizing, or delivery? We're just an email away.

Live Shipping Estimates:
Enter your location at checkout to see available shipping methods and costs for Bando 11C195 Power King Combo, CM195 Syncro-Link STS HP Neoprene (Metric) in your area.

Get Shipping Estimates

You may also like

recommand products

{{{showcase_5_name}}}

US$ {{{showcase_5_price}}}

Min. order: 1 piece

{{{showcase_5_star}}} ({{{showcase_5_reviews}}} reviews)

Sold : Login>>

{{{showcase_6_name}}}

US$ {{{showcase_6_price}}}

Min. order: 1 piece

{{{showcase_6_star}}} ({{{showcase_6_reviews}}} reviews)

Sold : Login>>

{{{showcase_7_name}}}

US$ {{{showcase_7_price}}}

Min. order: 1 piece

{{{showcase_7_star}}} ({{{showcase_7_reviews}}} reviews)

Sold : Login>>

{{{showcase_8_name}}}

US$ {{{showcase_8_price}}}

Min. order: 1 piece

{{{showcase_8_star}}} ({{{showcase_8_reviews}}} reviews)

Sold : Login>>

{{{showcase_9_name}}}

US$ {{{showcase_9_price}}}

Min. order: 1 piece

{{{showcase_9_star}}} ({{{showcase_9_reviews}}} reviews)

Sold : Login>>

{{{showcase_10_name}}}

US$ {{{showcase_10_price}}}

Min. order: 1 piece

{{{showcase_10_star}}} ({{{showcase_10_reviews}}} reviews)

Sold : Login>>